Cut Transformer End-of-Life Costs

Stop Paying for Field Pump-Outs

Every leaking transformer left in the field means a contractor pump-out, a haul-away fee, compliance exposure and a written-off asset. ABG containment lets crews contain, lift and transport leaking pole-mount, pad-mount and capacitor units in one trip and keep repairable transformers in play.

  • Investor-Owned Utilities
  • Electric Cooperatives
  • Municipal & Public Power
  • Utility Line Contractors

Distribution & Line Operations

Crews contain, lift and transport leaking units in one trip. No waiting on a pump-out contractor.

Environmental & Compliance

Leaking-article containment built for 40 CFR 761.65, with lower spill and penalty exposure.

Asset Management & Engineering

Repairable transformers stay sellable or return to service through long replacement lead times.

Procurement & Supply Chain

Less contractor spend on pump-outs and haul-away, and fewer new-unit purchases.

Your Units

Leaking & Failed Units per Year

Repairable Units

End-of-Life Path

Repairable units sell to a certified recycler or repair vendor. Remaining units sell as scrap.

Oil Classification

PCB Status

Tested below 50 ppm PCB. Standard oil disposal rates apply.

Your Utility’s Numbers

Costs & Rates

Defaults come from published utility and contractor rates. Enter your own for a sharper estimate.

All Costs & RatesHaul, oil disposal, spill exposure, recovery and capacitor defaults

ABG Containment ROI

Savings for Your Utility

Estimated Annual Savings

—

Per year, net of ABG containment, crew handling and yard transport

Annual Savings Breakdown

Refurbished Transformers Resell at About Half the Price of NewField pump-out and haul-away hand that value to the recycler, after the utility pays for both.

Methodology, Assumptions and References

Comparison

Current utility practice: the crew swaps the failed unit and leaves the leaker in the field, a supervisor dispatches a third-party pump-out, and the contractor pumps the oil, hauls the unit away and charges again for transport to a recycler. The utility recovers nothing. ABG containment: lineworkers bag the unit in a BOB® or set it in a FlexTray™, lift and carry it with the oil in place, store it contained at the yard, and release it for repair or recycling on the utility’s terms.

Calculation

Annual savings = units per year × (avoided costs + value recovered − ABG containment, crew handling, yard transport and residual risk). Avoided costs: supervisor coordination, pump-out, contractor haul and transport, drained-oil disposal and absorbents, and expected spill and penalty cost while a leaking unit waits in the field (probability × cost). Value recovered: on the recycler path, repairable units sell at resale value and the rest at scrap; on the repair path, each repairable unit replaces a new purchase (new price − repair cost). PCB units use PCB disposal rates, a higher spill cost and no recovery value.

Product Fit

Pole-mount: BOB-26 (10–25 kVA), BOB-32 (37.5–75), BOB-42 (100–167), BOB-70 (250–500). Single-phase pad: BOB-48 (25–100), BOB-60 (167). Three-phase pad: BOB-72 or FlexTray CT-84 (≤500 kVA), FlexTray CT-84 (750–1,000), FlexTray CT-96 (1,500). Units above 1,500 kVA require a custom solution and are excluded from totals. Pole-mount capacitors: CAPBAG CAP-01. BOB-26, 32 and 42 carry one UN 51H rating; BOB-48 and 60 carry a second. Both are authorized packaging for UN2315 PCBs, liquid, under DOT Special Permit 21582 and built for EPA/TSCA (40 CFR 761.65) leaking-article containment. BOB-70 and BOB-72 exceed the UN test range. FlexTray is not UN-rated. Full specifications on each abgbag.com product page.

Capacitors

Failed capacitors carry no repair or resale value. Savings come from replacing the drum or overpack, absorbents and extra handling used today, and from lower spill exposure. Disposal cost is equal on both sides and excluded. Capacitors built before July 2, 1979, or of unknown date, are treated as PCB capacitors (40 CFR 761.2) and incinerated (761.60).

DefaultValueBasis
Pump-out, three-phase pad$4,000ABG customer-reported field practice (2026); Illinois responder rates build to $5,000–8,000
Pump-out, pole / single-phase pad$800 / $1,100Public contract rate caps: 4-hr minimum × $136–188/hr vacuum truck + mobilization (MN Rule 2890.3800; TN; DE)
Contractor haul + transport$1,000–2,000 est.Illinois 2025 flatbed rates ($150–325/hr, 4-hr minimum, $4–6/mi); DAT spot flatbed $3.64/mi
Oil disposal$1.30/gal; PCB $15.60/gal$1.00/gal + 30% contractor markup (IL 2025); PCB $12/gal (EPA-posted 2020 estimate), inflated
Labor / truck$110/hr / $150/hrUtility fee schedules: Eastern Illini EC (2024), New Prague MN (2025), North Platte NE (2026)
Spill during field wait15% × $3,500 or $15,000 est.Tiers built from MN Petrofund FY27 rate caps and utility cases; no handling-stage spill data is published
Penalty exposure3% × $19,461 est.EPA Region 4 v. Orlando Utilities Commission (2025); probability estimated
Repairable share50% est.Estimate
Recycler payment, three-phase pad$2.25/kVACity of Denton–Alamo contract: $2.00–2.50/kVA for electrically good pad units
Scrap$0.15/lb est.Between scrap-yard ($0.05–0.25/lb, Rockaway 2026) and recycler ($0.35–0.45/lb) prices
New / repair priceBy size2025–26 municipal bid tabs (Geneva IL, Greenville NC, Bay City MI); Denton recondition prices +15%
Oil volume / weightBy sizePower Partners pole spec sheet; Eaton CA08104001E Table 17.0-13; GE capacitor spec sheets
Capacitor drum / absorbents / handling$279 / $50 / $100 est.Illinois 2025 responder rates; overpack range $143–375 (Iowa 2023, Vermont 2023–25)
Capacitor spill20% × $2,000; 5% with CAPBAG est.Estimate; no capacitor-specific spill cost data is published

Estimates are marked est. Results are illustrative and vary with each utility’s practices, contracts and transformer mix. ABG product pricing is included in the calculation and not displayed.

City of Denton. (2023). Ordinance and contract, RFQ 8192, Exhibit E (Alamo Transformer Supply). Legistar.

City of Geneva, IL. (2026). 2026–2027 distribution transformers bid tabulation. https://geneva.il.us/DocumentCenter/View/17028

Classic Towing & GreenTech Spill Response. (2025). 2025 incident response rates. https://napervilleclassictowing.com/wp-content/uploads/2025/07/Classic-Towing-GreenTech-Incident-Response-Rates-1.pdf

Eaton. (2016). Pad-mounted transformers consulting application guide (CA08104001E).

GE Grid Solutions. (n.d.). Capacitor spec sheets 58L132WC60, 98L108WC60.

Minnesota Department of Commerce, Petrofund. (2026). Investigation – contractor heavy equipment, soil disposal, other (FY27).

Offutt, M. C. (2026). Electricity distribution transformers: Supply, tariffs, and policy options (CRS Report R48933). Congressional Research Service.

Power Partners. (2021). Single phase overhead distribution transformers spec sheet.

U.S. EPA Region 4. (2025). Consent agreement and final order: Orlando Utilities Commission (TSCA-04-2025-6200(b)).

40 C.F.R. pt. 761 (2026). Polychlorinated biphenyls (PCBs) manufacturing, processing, distribution in commerce, and use prohibitions.